Skip to content
EG Ajour Help

EG Ajour Help

  • Guides
  • English
  • Dansk
EG Ajour Help
EG Ajour Help

Administration

18
  • Access request
  • Administration module
  • Archive/Deactivate, activate or delete a project
  • Buy licenses (Add-on purchase)
  • Change the e-mail address of an existing user
  • Create a new user
  • Create project
  • Deactivate user
  • Edit project information
  • Explanation of license types
  • Give an existing user access to a project
  • Merge two companies
  • Remove a user from a project
  • Resend activation mail and New password
  • Role standards
  • Share your license with other Ajour systems
  • The User Settings menu
  • User permissions in EG Ajour

AjourBox

14
  • BIMviewer
  • Blueprints on project
  • Create and manage folder templates
  • Download files from AjourBox
  • Edit assignment
  • File management in AjourBox
  • File review
  • Folder log
  • Folder types in AjourBox
  • General information about AjourBox
  • Manage folders on the project
  • Revision and version control
  • Search functions in AjourBox
  • Upload of .zip file in AjourBox

AjourFm

6
  • BE-card reports
  • Copy all BE-groups and cards from one project to another
  • Create new BE-card
  • Fill in a BE-card
  • Operating plan
  • Workflow with BE-cards

AjourInspect & QA

30
  • Add comment to a registration
  • Bulk editing of registrations
  • Create registration
  • Deeplinking in AjourInspect & QA
  • Download registration images
  • Filtering, sorting and grouping
  • Print registration drawing
  • Print report
  • Registration statuses in EG Ajour Inspect & QA – what do they mean?
  • Registration types / Note types
  • Report generator
  • Status on registrations
  • Categories/shema
    • Categories/schema: Calculated scope
    • Categories/schema: Concept explanation
    • Categories/schema: Import and export control schema
    • Categories/schema: Print
    • Categories/schema: Project Setup
    • Categories/schema: System Setup
    • Copy content from a project group to another project
  • Manage a registration
    • Change deadline on a registration
    • Change groups on a registration
    • Change project level on a registration
    • Change receiver on a registration
    • Change registration type
    • Copy registration
    • Edit registration
    • Forward registration
    • Hide or restore registration
    • Labels
    • Show registration log on a registration

AjourTender

22
  • Cancel tender
  • Change offer responsible / bidder on a contract
  • Complete selection
  • Create and manage a tender in AjourTender
  • Create and upload an ESPD (Tender administrator)
  • Download tender materials
  • Download, complete and upload ESPD (Bidder)
  • Edit a tender
  • Filter and sort tenders in AjourTender
  • Invitation to a tender
  • Inviting users to a tender
  • Log (Tender log)
  • Overview and Filter
  • Participate in a public tender
  • Questions / Answers
  • Reopening of tenders
  • Roles in a tender
  • Send Result List
  • Status of a tender
  • Upload tender/PQ
  • Correction sheet
    • Send out correction sheet (Tender administrator)
    • View correction sheets as a bidder

App

28
  • Activating and using Tablet mode (App)
  • Download the EG Ajour app
  • EG Ajour app version App Store / Google Play
  • Log in to the EG Ajour app
  • Settings (App)
  • The app’s buttons or action options are not displayed correctly
  • The Menu function
  • App - AjourBox
    • Download, Rename and Delete files (App)
    • Search for files (App)
    • Sort files (App)
    • Upload file or photo (App)
  • App - Inspect & QA
    • Add comment to a registration (App)
    • Add registration on registration drawing (app)
    • Add registration without registration drawing (app)
    • Camera – with and without “Enhanced camera”
    • Change receiver on a registration (App)
    • Change type on a registration (App)
    • Create blueprint (App)
    • Delete or hide registration (App)
    • Edit registration photo (app)
    • Filtering registrations
    • Forward registration (App)
    • Move registration
    • Search by registration number
    • Status on a registration (App)
  • Synchronization of EG Ajour app
    • Synchronization conflicts in the EG Ajour app
    • Synchronization error: Authentication error – check username and password (App)
    • Synchronization of the EG Ajour app

Generally

14
  • Allowed file types (current list) 
  • Create a new user in Ajour System 
  • Definition of registration types. 
  • EG Sasha in EG Ajour 
  • Email notifications 
  • Find your system name for EG Ajour 
  • Home / Dashboard 
  • Log in to an Ajour system (Web) 
  • Login page (Web) 
  • Overview of elements in a registration 
  • Reset Password 
  • The modules (Web) 
  • Troubleshooting: You do not receive an email from EG Ajour 
  • User settings
View Categories
  • Home
  • Docs
  • Generally
  • Email notifications 

Email notifications 

5 min read

0:00 / 5:00
  • View as Markdown Open this page as plain Markdown (opens in a new tab)
  • Open in ChatGPT Ask questions about this page (opens in a new tab)
  • Open in Claude Ask questions about this page (opens in a new tab)
  • Open in Google AI Studio Ask questions about this page (Google account required) (opens in a new tab)
Context  #

EG Ajour automatically sends email notifications to users when changes occur on registrations, files or tenders that the user is associated with. The notifications are controlled partly via the individual user’s project permissions in the administration module, and partly via the user’s own settings. 

Relevance  #

This guide is relevant if a user does not want daily status emails and therefore wants to adjust or remove them. 

Prerequisites and requirements  #
  • To remove notifications on specific or all projects, the role System administrator or Project Administrator is required. 
  • To change your own user settings, you only need to be logged in as the relevant user. 
  • Knowing which projects the user is associated with is an advantage when adjusting project-specific notifications. 

Which email notifications are sent from AjourInspect & QA 

You will receive an email notification when the following changes occur on registrations you are the recipient of or responsible for: 

  • The primary status of a registration changes, e.g. to created, completed, rejected, done or not approved 
  • The forwarded status of a registration changes, e.g. to created, completed, rejected, done or not approved 
  • A new comment is added to a registration 

Which email notifications are sent from AjourBox 

You will also receive an email notification when new files in AjourBox are updated or uploaded in folders you are meant to see, for the current project. The notification collects: 

  • New registrations since the last email was sent 
  • New uploaded or updated files in AjourBox 

Which email notifications are sent from tenders in AjourTender 

You will also receive the following email notifications from tenders in AjourTender if you are a bidder: 

  • When you are invited to participate in a tender or a contract 
  • When a tender you are participating in changes status, is extended, or a new tender round is opened 
  • When a correction sheet is issued for a tender you are participating in 
  • When a question asked in connection with a tender you are participating in is answered 

Note: The above notifications from AjourTender are sent automatically to all invited bidders and cannot be removed individually for a single tender. 

  • The tender administrator can send a manual reminder if you have not yet replied as to whether you are participating in a tender or not 

Which email notifications are not sent / Limitations 

You will not receive an email notification when the following happens: 

  • When you are granted project permissions for a new project 
  • When your company is assigned one or more folders in AjourBox 

Note: The list is not exhaustive. There may therefore be other scenarios, not described here, where users can expect an email notification but do not receive one. 

Remove email notifications on specific projects for a user 

Email notifications on specific projects are controlled under the user’s project permissions in the administration module. There are two relevant notification settings, both of which can be turned off individually. 

Note: Only users with the role System administrator or Project Administrator have access to the user administration module and can change other users’ permissions. 

Open user administration 

Log in to the Ajour system. 

Click the gear icon at the top right of the navigation menu. 

Select “User administration” in the menu. 

Find the relevant user in the list, and click the user’s row to select it. 

Open the user’s permissions 

A window with user data opens automatically. 

Click the tab “Permissions” at the top of the window. 

Select the relevant project in the dropdown field under “Project”. The permissions are project-specific. 

Remove email notifications under project permissions 

Under “Project permissions” in the right column there are two notification settings that can be removed: 

Daily status for updated files in AjourBox Expand “General”, and clear the checkbox for “Receive daily status on updated files in AjourBox”. 

→ Daily status in Inspect/QA Expand “Inspect/QA” “Registrations”, and clear the checkbox for “Receive daily status”. 

Save the changes 

Click “Save” at the bottom right of the window. 

The changes take effect immediately. 

Important: The notification settings are project-specific. If the user is associated with several projects, the steps from “Open the user’s permissions” to “Save the changes” must be repeated for each project where notifications are to be removed. Use the project dropdown to switch between projects without closing the window. 

Remove email notifications on all projects for a user  

Email notifications on all projects can be controlled under user settings. Here there is a single notification setting, “I want to receive daily status emails for all projects”, which can be turned on or off. 

Note: Only the user can change this setting. 

Open user settings 

Log in to the Ajour system. 

Click the gear icon at the top right of the navigation menu. 

Select “Settings” in the menu. 

Clear the checkmark next to the text “I want to receive daily status emails for all projects”. 

Click “Save”. 

Important: This notification setting affects all projects the user is associated with. 

Next steps  #
  • Inform the user that the change has taken effect, and which notifications will still be sent, e.g. from AjourTender. 
  • Consider saving a filter in the AjourTender overview if the user wants to follow tenders manually instead of via email. 

What are your Feelings

  • Happy
  • Normal
  • Sad
EG Sasha in EG Ajour Find your system name for EG Ajour 

Powered by BetterDocs

Table of Contents
  • Context 
  • Relevance 
  • Prerequisites and requirements 
  • Next steps 

© 2026 EG Ajour Help

  • Guides
  • English
  • Dansk