Users can now copy all BE-groups and cards from one project to another in one action – instead of having to copy each card individually through the card view.
Before: Users had to open each BE-card separately and select “Copy BE-card” After: The “Copy from” button on the BD-board does it all at once
How it works #
1. Navigate to the BD-board in the destination project (the project you want to import to)
2. Click the “Copy from” button
3. Select the source project in the drop-down menu
4. Confirm – all BE-groups and cards are imported
Important limitations and requirements #
Prerequisites #
- The BD-board must be empty (no BE-cards may exist yet)
- The user must have the project permission Ajour FM – Create
- The destination project must be able to accept all BE-groups from the source
What is NOT copied #
The following fields are NOT imported:
- Installation date
- Warranty start date / end date
- Operation start date
- Warranty responsible (person + company)
- Operation responsible (person + company)
- Attached files and documents
- Comments
This is intentionally designed this way – these fields are project- or construction-specific.
✓ What CAN be copied #
- BE-card structure and data
- Maintenance elements (maintenance components)
- Supplier information
- The entire BE hierarchy
Important technical details #
BE-groups and templates #
- The system supports templates: SFB, FVK and user-defined
- If you copy from an SFB project to an FVK project, the FVK project will be converted to the SFB template
Property groups #
- All property groups in the destination project must be empty
- You can not mix imports between different property groups in the same operation
- If the project has several property groups with cards, the import fails
Error handling #
If the BD-board is not empty:
- Error message: “Copy failed. The BD board must be empty.”
- A toast notification is shown – the dialog does not open
When should this function be used? #
Perfect for:
- Setting up new projects based on existing templates
- Standardising the FM structure across projects
- Saving time when the same BE hierarchy needs to be repeated many times
- Not for:
- Migrating existing card data between projects (use export/import or manual copying of individual cards instead)
- Merging data from several projects
